It was an exciting day yesterday at Creative Surfaces. The construction is well underway. The old decrepit tunnel is long gone, making way for a brand new tunnel! This new tunnel will be large enough for a forklift to make its way between the different divisions.
- Torch cutting the tunnel.
- inside tunnel entrance – boarded up
- Inside view of tunnel entrance
- North side of tunnel
- North side of tunnel
- Tunnel Removal
- Tunnel Removal
- Outside south side of tunnel
- Tunnel destruction
- Tunnel destruction
- Tunnel destruction
- Tunnel Removal
Last week we made way for the dust box reposition. It was previously located in the middle of the plant & will soon be located on the north side, making for more production area within the casework division. Concrete was poured in preparation for this.
- Concrete poured in preparation of new dust box.
- Dust box parts
- Dust box disassembled.
Keep watching for more updates, and as always – keep Creative Surfaces in mind for your next millwork, countertop or signage project!